Infrastructure

The main building is equipped with:
  • Ventilation
  • Fire alarm system
  • Ceiling height 10-15 m
  • Column grid 30x6 m
  • The floor load is 6 tons/sq. m.
Administrative building
Car service for trucks
Bulk materials warehouse
Security Checkpoint
Parking for trucks
Railway line
Platform for containers

The plan-scheme, presented in this section will help you to orient in the area of the Industrial park “Lider”. The main entrances and exits, fire entrance are put on the plan. The whole area is divided into zones in which it is convenient to place productions of a particular type.

Thank you for reading this post, don't forget to subscribe!

Main Building

  • Main building area: 76,000 sq. m;
  • Column pitch: 30x6 m;
  • Room height: 10-15 m;
  • Temperature range: +10 – +18;
  • Floor load: 8 t/sq. m;
  • Installed electric power: 25 MW;
  • Gas consumption limit: 5 million cubic meters/year.
  • The minimum area of the section is 1,000 sq. m.
  • The area of office space is 100 sq. m.

Managing Company

The entire park’s infrastructure is controlled by a professional managing company which successfully works in the market of commercial estate since 2004. The services list of this organization contains almost every type of work, for example, railways repair or loading works. You will immediately estimate the convenience of one-company-management, due to the possibility of solving energy, heat and supply problems in one place. This centralization provides flexible policy to the managing company, the ability to act individually in accordance with the needs of each client.
Scroll to Top