Infrastructure
The main building is equipped with:
- Ventilation
- Fire alarm system
- Ceiling height 10-15 m
- Column grid 30x6 m
- The floor load is 6 tons/sq. m.
Administrative building
Car service for trucks
Bulk materials warehouse
Security Checkpoint
Parking for trucks
Railway line
Platform for containers
The plan-scheme, presented in this section will help you to orient in the area of the Industrial park “Lider”. The main entrances and exits, fire entrance are put on the plan. The whole area is divided into zones in which it is convenient to place productions of a particular type.
Thank you for reading this post, don't forget to subscribe!Main Building
- Main building area: 76,000 sq. m;
- Column pitch: 30x6 m;
- Room height: 10-15 m;
- Temperature range: +10 – +18;
- Floor load: 8 t/sq. m;
- Installed electric power: 25 MW;
- Gas consumption limit: 5 million cubic meters/year.
- The minimum area of the section is 1,000 sq. m.
- The area of office space is 100 sq. m.